Back to School in Weybridge: Post-Flood Recovery Efforts

Back to School in Weybridge for Post for Flood Recovery Efforts

Back to School in Weybridge: Post-Flood Recovery Efforts

We recently revisited a familiar site – a school in Weybridge where we previously removed flooring for science lab refurbishments.
 
It’s rare we get to see the transformations our work enables, but this time was an exception.
 
Unfortunately, our return was under challenging circumstances: a major flood affected 9 rooms.
 
Over the next 6 weeks, we’ll be meticulously clearing the water damage, working in tandem with the school and insurers to minimise disruption.
 
Our team is prepared for this project, scheduling works during evenings and weekends.
 
Special mention to Joe for making sure it was all clean and tidy at end of each shift, and to all the lads for their efforts so far.
 
Of which…
 
The Head master approached Terry Cross last night to thanks us for our efforts and said how professional we had been
 
A special thanks to G Bowmer for providing the skip. And let’s not forget the bacon rolls – a small gesture of appreciation for our Supervisor, Ops team, the skip driver, and the school caretaker even got a treat too 