Skip to content
Westcross Environmental Services Main Logo_White
Search
Close this search box.
Case Studies: Project to remove asbestos from a school boiler room
Case Studies: Working at an established entertainment venue
Case Studies: Summer work at a college basement plant room
Case Studies: Phase 2 of summer works at a school

Summer work at a college basement plant room

SUMMER WORK AT A COLLEGE BASEMENT PLANT ROOM

Summer work at a college basement plant room

Highlighting Our Summer Work at a College in the Midlands

As schools take a break, our teams are hard at work ensuring a safe environment for all.

On the Agenda at this college’s Basement plant room:

  1. A meticulous pre-clean of the floor area, removing debris to the perimeter under locally controlled conditions.

  2. Ensuring the safe removal and disposal of asbestos insulation residues, especially from walls where paint is flaking- under fully controlled conditions

  3. Additionally, removing paintwork surrounding the existing flue—all under fully controlled conditions.

A special shoutout to our client, Hinckley Plumbing & Heating Services Ltd

Well done to Nathan and his diligent team for the impeccable work so far! 👏

Keep up the good work!

Gallery

Get in touch

RECENT ARTICLES

Free quotes

24 hour emergency support

get in touch